Open 7 Days a Week 1627 N. Clybourn Ave · Lincoln Park, Chicago Call us live · 312·202·1110
In stock · Lincoln Park
4" x 5" Rosewood Arch Piano Finish Clock, Brass Base, Diamond Spun Dial, 3 Hand Movement with Black Laserable Plate
SKU·CAS.BC46 In Stock
Loop Series

Rosewood Arch Piano Finish Clock

Arched rosewood piano finish clock, brass-tone base, diamond-spun dial, black plate. Engraved in Lincoln Park.

Size4" x 5"
★★★★★ 4.9 · 180+ Google reviews · Engraved in Chicago since 1981
$107.78 Single piece · Volume pricing below
Material
Glass
Type
Sculptural Award
Min. order
1 piece
Engraving
$50–$80 / piece
Lead time
5–7 days · 1–5 rush
Pickup
Free · Lincoln Park
Product details

Elegant rosewood piano-finish clock with gold metal base. This traditional clock features a diamond-spun metal dial with a three hand movement. The quality and craftsmanship of this clock will tell the recipient they are valued by your organization. Black brass engraving plate included. Gift boxed for presentation. All Stuart-Austin clocks are supplied with quartz movements. Batteries Included.

Personalize

Add engraving + $50–$80 / piece
Up to 4 lines · 80 chars per line 0 / 320
Font style
Block
Script
Modern
Classic

Have a specific layout or spacing idea? Add a note below — or just check out and a designer will confirm everything before we engrave.

Add your logo + $90 · one-time setup

Volume pricing

Per piece, before engraving
QuantityPrice eachSave
1 piece$107.78
5+$99.16−8%
10+$92.69−14%
25+$86.22−20%
50+Contact usQuote-based
Estimated total
$107.78
Have a question about this piece? We're here.
Request a Quote
What happens next
  1. We email you within 1 business day with a digital proof of your engraving layout.
  2. You approve, request changes, or cancel — nothing is engraved until you say go.
  3. We engrave in-house in Lincoln Park and ship, or you pick up free.
Engraved in-house in Chicago
Real designer for every layout
Local pickup or ships anywhere
Material
Glass
Type
Sculptural Award
Engraving area
Front face
Lead time
5–7 days after proof · 1–5 with rush